Saturday 2 January 2016

Architecture BQ

Bills of Quantity (BQ) Architectural Work is BQ that describe items clearly architectural work and detail including quantity and specifications are determined. BQ architecture consists of:

1. Brickwall work

Record price for the work Walls are:

  • Unit price brick wall, brick, Hebel, Celcon has included regular mortar or Drymix, practical columns, ringbalk, anchor, anchor, and all auxiliary work related to the work of the wall.
  • Unit price of ordinary stucco or Drymix already included acian, skonengan, rope water, ketrikan or bobokan concrete or brick, chicken wire (if necessary) and all related auxiliary work with plaster.
  • Unit price wallcoverings (such as granite, marble, ceramic, porcelain) has included mortar, cast concrete, adhesive (calbond), anchors, wire fastener aluminum fixing to the wall with a height of more than 2m, cutting, pinggulan, sweet race, Naad , and other tools
  • Unit price stucco work has included watertight walls according to drawings and specifications
  • Paint wall unit price already includes the sense primer (meni, plamur, stained, sealer).
  • Unit price already includes the necessary tools and the appropriate specifications.

A. Brickwall work
Couple Celcon blocks brick / Hebel / red brick to the wall, 100 mm thick, including a thickening of the wall of the urinal & Closed, adhesives, mortar, practical columns and beams, as per the specifications and drawings.

B. Plester
Plastering work inner and outer walls including aci job using mortar 1: 3, 1: 5 and so on.

C. Paintwork
Painting with emulsion paint / weather shield, including tools and equipment according to specifications and drawings

D. Ceramic wall
Finish ceramics, homogenous tile, Granite etc., including tools and equipment according to specifications and drawings

E. Partition kubikal
Toilet cubicle partitions compressed laminate board in the finish, including the following doors with aluminum casting and hanging clamp complete with a set of hardware accessories and equipment tools and equipment installed according to the specifications and drawings



2. FLOOR

Record price for the work floor are:


  • The unit price has included the installation of a border, cutting, cleaning, perapihan and wasted material (waste)
  • Unit price already includes leveling (sloping) mortarmix according Required
  • Wide floor coating is calculated net (net area)
  • Each work must be in accordance with the manufacturer's instructions Required


A. Floor Hardener
Concrete slab w / smooth plaster + Uzin floor hardener non metalic paint + anti-dust (for ramp use anti-slip grooves) includes tools other tools fixtures equipment installed in accordance with the specification and drawings.

B. Ceramic Floor
Ceramic Tile uk. 40x40cm, 30x30cm, 60x60cm etc (slip non-slip), the following mortar, additiv, grout grouting tools including other tools supplies equipment installed in accordance with the specification and drawings.

Finishing work as well as others such as the installation of flooring, granite, homogenous tile, mosaic, Plint floors, stairs etc. stepnose.

3. CEILING WORK
Note ceiling price for the work is:

  • Ceiling unit price already includes the framework, the framework of the meeting with the extra columns, beams, walls and pit equipment M / E (lights, grille air conditioning, etc.).
  • Unit prices are including anchor-anchor, nuts, bolts, screws, mailing wood, wires, hangers, lights or grill hole AC.
  • Unit price ceiling wooden boards, pergola, lambresiring has included anti-termite, painting (polyurethane) including anti-termite, fire retardant and has dried (dryclean)
  • Extensive vertical ceiling and the ceiling (drop ceiling) is not reduced by extensive fields, lights and grille A / C
  • Unit price ceiling paint job including the definition of the base paint (plamur, meni, stained, sealer and other auxiliary materials)
  • Mailing list unit price ceiling has included supporting frame and finishing (painting)
  • Ceiling unit price is inclusive of corner bead & Shadow Line
  • Unit price in accordance with the Drawings and specifications

4. DOORS & WINDOWS
Record price for the work of Door & Window is:

  • Unit price of wooden windows and doors already includes anchorage, glass fixtures, installation of columns and practical ringbalk around doors and windows, and auxiliary equipment required and wasted material (waste).
  • Unit price of steel doors and windows are including anchor, welding, glass, columns and beams practical installation around doors and windows, and auxiliary equipment required and wasted material (waste).
  • Unit price of aluminum doors and windows already included anchors, sealants, rubber, glass, welding, installation of practical columns around doors and windows, and auxiliary equipment required and wasted material (waste).
  • Each work must be in accordance with the manufacturer's instructions required.

5. WORK SANITARY
Note Prices for Sanitary work are:


  • Wages unit price sanitair (sanitary equipment) with the completeness of auxiliary materials (mortar, stucco, acian, nad, sealan, grouting, auxiliary materials pengubung (doble niple) associated with ME and other installations following installation and perapihannya.
  • Each work must be in accordance with the manufacturer's instructions required.


Bills of Quantity Job Architect Please Download Here

Engineering, Economics & Business
Aam Hermawan

No comments:

Post a Comment

statistics

About Me

My photo
...... Honest-Sincere-Reliable ...... Main key in my life .... keep istiqomah ... Amiiin .....