Mob & Demob Costs for Preliminary BQ

Mobilization & demobilization costs and equipment costs are costs that cover the cost of mobilization and demobiliasi manpower and equipment.
Mobilization and demobilization costs including license fee income working equipment and supplies into the project site and the transfer from one place to another in the location of the work, including Tower Crane and Hoist Passenger by another contractor, and removing it after completion of the work. Or, if necessary, with regard to working methods (mail calibration tool).
Below are details of some of the items that need to be taken into account:

  1. Equipment
    • Hydro Crane
    • Tower Crane
    • Passenger Hoist
    • Material Hoist
    • Concrete pump
    • Concrete Placing Boom 
    • Mobile Crane
    • Fork Lift
    • Cargo truck
    • Water truck
    • Baby Roller
    • Air Compressor
    • Concrete Vibrators
    • Rebar cutting machine
    • Rebar bending machine
    • Welding Machine
    • Stamper
    • Concrete Cutter
    • Hammer Drill
    • Jack hammer
    • Vibrator screed
    • Angle Grinder Machine
    • Sandpaper Electric
    • Ceramic cutting machine
    • Electric SAW
    • Concrete machine (Molen)
    • Concrete drill
    • Ramset
    • Concrete Cube
    • Concrete Basketball
    • Rubbish Box
    • Handy Talkie (HT)
    • Other aids
  2. Equipment Survey
    • Total Station
    • Theodolite
    • Waterpass
    • ZNL (Optic Pelmet)
    • calibration
  3. Gasoline & Oil
  4. Operator

For an example of the calculation can be downloaded here

Engineering, Economics & Business
Aam Hermawan

No comments:

Post a Comment

statistics

About Me

My photo
...... Honest-Sincere-Reliable ...... Main key in my life .... keep istiqomah ... Amiiin .....