These costs are very important taken into account by the contractor and included in the BQ preliminary offer.
below is included in the costs of temporary work
- Setting out & Marking
- benchmark
- bouwplank
- Meter
- Bak Measure
- Consumable
- Safeguarding work
- Railing
- safety net
- Closing shafts / Core
- stressing Plate
- Maintenance of existing facilities
- Road
- Fences and Main Gate
- Drainage
- Sign Board
- fence Project
- scaffolding
- temporary stairs
- Gondola
- Excavation protection
- Piles incld. capping beam
- Screed + Chicken Wiremesh
- Trash can
to see how the calculation can be downloaded here